Shanghai GOVO Telecom Co., Ltd.

Tel.: +86-21-60712325-807

Shanghai GOVO Telecom Co., Ltd.
Tel.: +86-21-60712325-807

Fiber Optic Patch Cord Production Flow
  • Raw material: fiber optic cable
  • Step 1: Cutting fiber cable to
    desired length
  • Step 2: Stripping fiber cable
  • Step 3: Assembling components
  • Step 4: Injecting glue
  • Step 4: Injecting glue
  • Step 5: Assembling connector
  • Step 6: Crimping
  • Step 7: Polishing
  • Step 8: Checking end faces of
    ceramic ferrule with video
    microscope
  • Step 9: Testing insertion loss and
    return loss
  • Step 10: 3D scoping

  • Step 11: Rechecking end faces of
    ceramic ferrule before packing
  • Step 12: Packing
  • Step 12: Packing